Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:

B235 Worple Road, Wimbledon, London, Merton
05 March — 06 March
Delays likely Traffic control (multi-way signals)
Works location: B235
Works description: Main Clamp 0 To 6" Within Carriageway Only In Carriageway. Our Intentionis To Complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

March 4, 2016