Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some delays:

A219 The Broadway, Wimbledon, London, Merton
07 August — 11 August Some carriageway incursion
Delays possible due to Streetworks
New Water Connection 1x4 Port Mdpe Mtrd Manifold Off Of 3" Ci Mainexc Avating 2m Footway In Footway. Our Intention Is To Completethepermanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A238/B235 Worple Road, Raynes Park, London, Merton
07 August — 08 August Some carriageway incursion
Delays possible due to Streetworks
Reinstate Footway In Footway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase at A238/B235
Responsibility: Thames Water
EToN status: Planned work about to start
A238 Kingston Road, Wimbledon, London, Merton
07 August — 13 August Some carriageway incursion
Delays possible due to Streetworks
Connections Small Service:New Individual Supply::Excavate And Expose Mians Cable For Installation Of A New Supply. at A238
Responsibility: UK Power Networks
EToN status: Planned work about to start

August 7, 2015