Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
A219 Wimbledon Hill Road, Wimbledon, London, Merton |
14 October — 18 October |
Delays likely Lane closure |
Works location: A219 |
Works description: Rvs 28day Hra Repair To Cw Channel Approx 3m X 2m. |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
A219 Wimbledon Hill Road, Wimbledon, London, Merton |
13 October — 13 October |
Delays likely Contra-flow |
Works location: A219 |
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
A238 Kingston Road, Wimbledon, London, Merton |
13 October — 13 October |
Delays likely Traffic control (two-way signals) |
Works location: A238 |
Works description: Excavate & Connect To Sgn Gas Main Providing Gas Supply To New Housing Development. Approx Dimensions: 3m X 0.5m Footway, 3.5m X 0.5m Carriageway. Depth: 0.8m. |
Responsibility for works: E S Pipelines Ltd |
Current status: Planned work about to start |
|
A219 Hartfield Road, London, Merton |
09 October — 13 October |
Delays likely Traffic control (two-way signals) |
Works location: A219 |
Works description: New Water Connection 2x32mm Mdpe Mtrd Supplies And 1x25mm Mdpe Mtrdsu Pply Off Of 3" Ci Main Excavating 3m Footway And 7m In Carriageway.Our Intention Is To Complete The Permanent Reinstatement In The Samephase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
|
|
A238 Kingston Road, Wimbledon, London, Merton |
09 October — 13 October |
Delays likely Traffic control (give & take) |
Works location: A238 |
Works description: New Water Connection 1x50mm Mdpe Mtrd Supply, 2x32mm Mdpe Mtrd Suppliesand 1x4 Port Mdpe Mtrd Manifold Off Of 7" Ci Main Excavating 3m Footwa Yand 3m In Carriageway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
October 12, 2017
|