Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:

A219 Wimbledon Hill Road, Wimbledon, London, Merton
14 October — 18 October
Delays likely Lane closure
Works location: A219
Works description: Rvs 28day Hra Repair To Cw Channel Approx 3m X 2m.
Responsibility for works: Merton London Borough Council
Current status: Planned work about to start
A219 Wimbledon Hill Road, Wimbledon, London, Merton
13 October — 13 October
Delays likely Contra-flow
Works location: A219
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
A238 Kingston Road, Wimbledon, London, Merton
13 October — 13 October
Delays likely Traffic control (two-way signals)
Works location: A238
Works description: Excavate & Connect To Sgn Gas Main Providing Gas Supply To New Housing Development. Approx Dimensions: 3m X 0.5m Footway, 3.5m X 0.5m Carriageway. Depth: 0.8m.
Responsibility for works: E S Pipelines Ltd
Current status: Planned work about to start
A219 Hartfield Road, London, Merton
09 October — 13 October
Delays likely Traffic control (two-way signals)
Works location: A219
Works description: New Water Connection 2x32mm Mdpe Mtrd Supplies And 1x25mm Mdpe Mtrdsu Pply Off Of 3" Ci Main Excavating 3m Footway And 7m In Carriageway.Our Intention Is To Complete The Permanent Reinstatement In The Samephase
Responsibility for works: Thames Water
Current status: Planned work about to start
 
A238 Kingston Road, Wimbledon, London, Merton
09 October — 13 October
Delays likely Traffic control (give & take)
Works location: A238
Works description: New Water Connection 1x50mm Mdpe Mtrd Supply, 2x32mm Mdpe Mtrd Suppliesand 1x4 Port Mdpe Mtrd Manifold Off Of 7" Ci Main Excavating 3m Footwa Yand 3m In Carriageway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

October 12, 2017