B279 Grand Drive, Raynes Park, London, Merton |
25 October — 27 October |
Delays likely Traffic control (Stop/Go boards) |
Works location: B279 |
Works description: 28 Day C/Way Breaking Out Around Sewer Cover And Frame Break Out And Reinstate Area 12 X 12 |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
|
|
B281 Copse Hill, West Wimbledon, London, Merton |
25 October — 27 October |
Delays likely Traffic control (Stop/Go boards) |
Works location: B281 |
Works description: Rvs 28day Hra Cw Channel Repair 4.5m X1.8m Plus 1.5sqm. Restore Yellow Line 4.5m Plus Letters 'S' & 'T'. |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
|
A238 Coombe Lane, Raynes Park, London, Merton |
23 October — 25 October |
Delays likely Lane closure |
Works location: A238 |
Works description: Uncover Buried Valve - In The Carriageway - 1st Time Permanent Reinstatement. |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
Cannon Hill Lane, Raynes Park, London, Merton |
23 October — 16 November |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
|
|
Ridgway, Wimbledon, London, Merton |
21 October — 25 October |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
A219 Wimbledon Hill Road, Wimbledon, London, Merton |
22 October — 24 October |
Delays likely Traffic control (multi-way signals) |
Works location: A219 |
Works description: Main Clamp 0 To 6" Within Carriageway Only In Carriageway. Our Intentionis To Complete The Permanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
A219 Hartfield Road, London, Merton |
19 October — 24 October |
Delays likely Traffic control (give & take) |
Works location: A219 |
Works description: New Water Connection 1x4 Port Mdpe Mtrd Manifold And 3x32mm Mdpe Mtrd Supplies Off Of 3" Ci Main Excavating 1m In Footway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |