Traffic disruption and diversions may occur due to lane and road closures
Gas Main Work Causing South Wimbledon Traffic Delays For Months
Two major pipeline projects are giving grief to local drivers
Emergency Gas Works In Southfields
Local Assembly Member Leonie Cooper and MP Justine Greening meet up with SGN on behalf of residents.
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays - including Grand Drive down to one lane until December:
11 October — 13 October |
|
|
Delays likely Traffic control (multi-way signals) |
|
|
Works location: Unknown |
|
|
Works description: To replace a single man hole cover and reinststae bitmac around the cover |
|
|
Responsibility for works: Merton |
|
|
Current status: Planned work about to start |
|
|
Works reference: HC011330010 |
|
|
10 October — 16 October |
|
|
Delays likely Road closure |
|
|
Works location: Unknown |
|
|
Works description: To carry out surfaciong works |
|
|
Responsibility for works: Merton |
|
|
Current status: Advanced planning |
|
|
Works reference: HC011314337 |
|
|
11 October — 12 October |
|
|
Delays likely Road closure |
|
|
Works location: Unknown |
|
|
Works description: To carry out surfacing works |
|
|
Responsibility for works: Merton |
|
|
Current status: Advanced planning |
|
|
Works reference: HC011314570 |
|
|
High Street Mews, Wimbledon Village, London, Merton 08 October — 25 October Delays likely Road closure Works location: Unknown Works description: Connections Projects:Electrical service alteration to customer supply:De sand LV trench to enable new cable termination on the end of our distribution board, instal rigiduct down high street mews. install road crossing. excavate small pulling hole Responsibility for works: UK POWER NETWORKS EASTERN & LONDON Current status: Planned work about to start Works reference: EC40010754364
Somerset Road, Wimbledon Park, London, Merton 28 September — 30 January Delays likely Road closure Works location: Unknown Works description: WORKING ON BEHALF OF THAMES WATER: MAINS REHABILITATION Responsibility for works: THAMES WATER Current status: Planned work about to start
Arterberry Road, Raynes Park, London, Merton 01 October — 13 October Delays likely Road closure Works location: Unknown Works description: lay 5m 180mmPE, Abandon 5m of 6"ci, make 2x mains connections, specialist contractor required to assist with installing UPT onto 15"ci main and abandon existing 6"ci main using remote foam off. Responsibility for works: SGN Current status: Planned work about to start Works reference: XW053W115588304-00216
|
October 12, 2018