Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur due to lane and road closures

 

Gas Main Work Causing South Wimbledon Traffic Delays For Months
Two major pipeline projects are giving grief to local drivers

Emergency Gas Works In Southfields
Local Assembly Member Leonie Cooper and MP Justine Greening meet up with SGN on behalf of residents.

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays - including Grand Drive down to one lane until December:

Ridgway, Wimbledon, London, Merton 27 October — 28 October Delays likely Traffic control (two-way signals) Works location: Unknown Works description: Rectify reinstatement defect in carriageway in Carriageway. Our intention is to complete the Permanent Reinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU302000030934948-001

B235 Worple Road, Wimbledon, London, Merton 25 October — 28 October Delays likely Traffic control (two-way signals) Works location: Unknown Works description: Service Pipe Repair <33mm within Footway and Carriageway only. Our intention is to complete the Permanent Reinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU302000031121122-003

A219 Parkside, Wimbledon, London, Merton

22 October — 26 October

 

 

Delays likely Traffic control (two-way signals)

 

Works location: Unknown

 

 

Works description: To excavate and lay new gas connection approx 1.6m c/w and 7m in f/w

 

 

Responsibility for works: Fulcrum Pipelines Limited

 

 

Current status: Planned work about to start

 

 

Works reference: WY002NSA00020768

 

 

A298 Botsford Road, Wimbledon Chase, London, Merton

22 October — 27 October

 

 

Delays likely Road closure

 

Works location: Unknown

 

 

Works description: To carry out entry treatment works to the speed table and footway works

 

 

Responsibility for works: Merton

 

 

Current status: Planned work about to start

 

 

Works reference: HC011-380971-1A

 

 

B235 Worple Road, Wimbledon, London, Merton

22 October — 27 October

 

 

Delays likely Traffic control (multi-way signals)

 

Works location: Unknown

 

 

Works description: Connections Projects:Electrical service alteration to customer supply:1 joint hole for new service

 

 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

 

 

Current status: Planned work about to start

 

 

Works reference: EC40010752591

 

 

 

B281 Cottenham Park Road, West Wimbledon, London, Merton 20 October — 28 October Delays likely Traffic control (multi-way signals) Works location: Unknown Works description: Mains connection at 522936 170007 to replace high risk dynamic growth main feeding 42-54 Cottenham Park Road Responsibility for works: SGN Current status: Planned work about to start Works reference: XW053W115660031-01632

Somerset Road, Wimbledon Park, London, Merton 28 September — 30 January Delays likely Road closure Works location: Unknown Works description: WORKING ON BEHALF OF THAMES WATER: MAINS REHABILITATION Responsibility for works: THAMES WATER Current status: Planned work about to start

B279 Grand Drive, Raynes Park
23 July — 10 December
Delays likely Lane closure
Works description: LAY 120M OF 75MM PE, 225M OF 90MM PE, 520M OF 125MM PE, 500M OF 180MM PE, ABANDON 205M OF 4" CI, 770M OF 6" CI, 485M OF 8" CI, TRANSFER 66 SERVICES, MAKE 29 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W114894639-02916

October 22, 2018