Traffic disruption and diversions may occur due to lane and road closures
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
26 February — 03 March |
|
|
Delays likely Lane closure |
|
|
Works location: Unknown |
|
|
Works description: Repair Thames Water leak on 0n 42" High Pressure water main leaking underground |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU277PTML212683/01 |
|
|
02 March — 03 March |
|
|
Delays likely Traffic control (two-way signals) |
|
|
Works location: Unknown |
|
|
Works description: New water connection 1x32mm B/P MTRD supply off of 7" CI main excavating3m footway and 1m in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU309000804800930100-002 |
|
|
Ridgway, Wimbledon, London, Merton 03 March — 06 March Delays likely Traffic control (two-way signals) Works location: Unknown Works description: Connections Small Service:Disconnection / reconnection of existing electricity supply for a customer:Excavation of joint hole in footway based on right hand corner of Lansdowne Road based on Ridgway;this is for the disconnection of an existing service supply. Footpath non maintainable -temporary walkway in carriageway required; additionally two way lights also required to manage traffic flow. See attached tm plan. Responsibility for works: UK POWER NETWORKS EASTERN & LONDON Current status: Planned work about to start Works reference: EC40010760561
March 3, 2019