Where else to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
01 August — 02 August
Severe delays likely - Road closure
Works location: Outside 3 - 5, SW20 8ZU Excavation in carriageway.
Works description: Fire Hydrant repair work on behalf of London Fire Brigade, excavation in carriageway.
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU2890000309436860050-01
31 July — 03 August
Severe delays likely - Road closure
Works location: Kingston Road, junction with Hartfield Road
Works description: Road closure on site so repairs can be carried out on the tram lines, works on behalf of London Trams.
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG60039667660
Wimbledon Hill Road, Wimbledon
01 August — 05 August
Delays likely - Lane closure
Works location: opposite 21-23
Works description: RS 28day b-out restore potholes in HRA cw 8.4m x3.5m.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00153586205
31 July — 04 August
Delays possible - Some carriageway incursion
Works location: outside 57
Works description: d 28 day asp uneven lifted by tree roots, lift and relay asp area 4.9 x 1.35
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00109577331
01 August — 05 August
Delays possible - Traffic control (give & take)
Works location: o/s 3
Works description: RVS 020720 1320. 2hr b-out restore potholes in cw 3.5m x1.8m.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00100356746
31 July — 04 August
Delays possible - Some carriageway incursion
Works location: outside 49
Works description: d 28 day asp uneven, lift and relay asp area 3m x .750 new supply 1x. 600
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00121609083
31 July — 04 August
Delays possible - Some carriageway incursion
Works location: outside 4
Works description: d 28 day asp uneven, lift and relay asp area 1.8 x 1.35
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00129571772
31 July — 04 August
Delays possible - Some carriageway incursion
Works location: outside 12
Works description: d 28 day asp uneven, lift and relay asp area 2.4 x 1.35
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00110069447
31 July — 04 August
Delays possible - Some carriageway incursion
Works location: opp 57
Works description: d 28 day asp uneven, lift and relay asp area 2.4 x 1.35
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00130577847
01 August — 05 August
Delays possible - Traffic control (give & take)
Works location: o/s 37 & 37A
Works description: RS 28day b-out restore potholes in HRA cw channel 2.8sqm.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00156759169
31 July — 04 August
Delays possible - Traffic control (give & take)
Works location: west side of crossroads with Murray Rd.
Works description: RS 28day b-out restore potholes across cw approx 6.5m x3.3m.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00148601398
Merton Hall Road, Wimbledon Chase
30 July — 04 August
Delays possible - Traffic control (give & take)
Works location: Outside 29, SW19 3PR
Works description: New water connection 2x32mm MDPE MTRD supply off of 4" CI main excavating 2m footway and 1m carriageway
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU309000809966490090-001
29 July — 05 August
Delays possible - Traffic control (priority working)
Works location: 2B WORPLE ROAD MEWS, SW19 4DB
Works description: Connections Small Service: Electrical service upgrade of customer supply to ensure safe and reliable power supply: 1PH DISC & 3PH INSTALL, ROAD CROSSING REQUIRED. TRAFFIC FLOW TO BE MAINTAINED
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: 120088952
30 July — 03 August
Delays possible - Some carriageway incursion
Works location: 14
Works description: RS 28day re-lay sunken hiload slabs 0.6m x0.4m. B-out restore
Responsibility for works: Merton
Current status: Advanced planning
Works reference: HC00122722780
Cottenham Park Road, West Wimbledon
27 July — 07 August
Delays possible - Traffic control (multi-way signals)
Works location: AT THE JUNCTION WITH CRANFORD CLOSE, CW / FW
Works description: GAS MAIN REPLACEMENT. TO COMPLETE MAINS CONNECTIONS. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117053449-01632
Cranford Close, West Wimbledon
27 July — 01 September
Delays possible - Traffic control (multi-way signals)
Works location: WHOLE ROAD, CW & FW
Works description: GAS MAIN REPLACEMENT. TO LAY 95M OF 75MM PE LP MAIN, RELAY 33 SERVICES, MAKE 1 CONNECTION AND ABANDON EXISTING 4" SI MAIN. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117053400-01674
27 July — 31 July
Delays possible - Some carriageway incursion
Works location: OS CORNWALL HOUSE, NS CW
Works description: LAY NEW MAIN TO SITE AT CORNWALL HOUSE, ELM GROVE BUSNIESS PARK, EXCAVATE IN NS CW MAINTAINING NORMAL TRAFFIC FLOW - PUBLIC RIGHT OF WAY SHALL BE MAINTAINED WHILE WORKS ARE CARRIED OUT
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW047W117258016-02415
29 July — 05 August
Delays possible - Traffic control (priority working)
Works location: 2B WORPLE ROAD MEWS, SW19 4DB
Works description: Connections Small Service: Electrical service upgrade of customer supply to ensure safe and reliable power supply: 1PH DISC & 3PH INSTALL, ROAD CROSSING REQUIRED. TRAFFIC FLOW TO BE MAINTAINED
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: 120088952
20 July — 30 October
Severe delays likely - Road closure
Works location: o/s 13 to o/s 58A
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: LONDON BOROUGH OF MERTON
Current status: Planned work about to start
Works reference: HC00245249629
20 July — 30 October
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011463552
Wimbledon Bridge, Wimbledon, London, Merton
15 June — 18 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-565935-1
Worple Road, Wimbledon, London, Merton
15 June — 22 December
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HG011-568756-1
July 31, 2020