Planned Roadworks In And Around Wimbledon


Where to watch out for road delays in and around SW19

South Wimbledon roadworks

Current roadworks in the Wimbledon area include:

Queen's Road, Wimbledon

31 August — 12 October 

Severe delays likely - Road closure 

Works location: C/W / F/W- Opposite Quadrangle Lodge to Next to Bus Stop O/S the Police Station 15-23 

Works description: Lay 141mtrs of 125mmPE. Abandon 141mtrs of 6"CI. Complete all services. Complete all connections. Complete all reinstatement. 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W116890673-05247

Botsford Road, Wimbledon Chase

07 September — 18 September 

Severe delays likely - Road closure 

Works location: Near junction with Kingston Road and Whately Ave 

Works description: COVID-19_Temporary Safety Measures. Supply and install temporary road closure 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00143367439 

Aston Road, Raynes Park

14 September — 18 September 

Delays possible - Some carriageway incursion 

Works location: In the public footway O/S 36. 

Works description: Connections Small Service: Installation of a new electricity supply for a customer: Install new three-phase service for customer. Works in public footway. 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: EC40097568263 

 

Deepdale, Wimbledon

14 September — 18 September 

Delays possible - Some carriageway incursion 

Works location: 9 

Works description: Connections Small Service: Installation of a new electricity supply for a customer: Excavation in footway to install new service. 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: EC40076264843 

 

Dorien Road, Raynes Park

14 September — 16 September 

Delays possible - Some carriageway incursion 

Works location: OUTSIDE 22 

Works description: Rectify self defect in the Carriageway 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU302000031457377-003

 

Hartfield Crescent, Wimbledon

15 September — 17 September 

Delays possible - Traffic control (give & take) 

Works location: opp 2 

Works description: d 28 day c way breaking out old trench, break out and reinstate area 9.3 x .60 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00115114680 

 

Rectory Orchard, Wimbledon Park

14 September — 16 September 

Delays possible - Some carriageway incursion 

Works location: Outside 9 

Works description: Excavate in the footway to repair damaged chamber - NLO16210 

Responsibility for works: VIRGIN MEDIA 

Current status: Planned work about to start 

Works reference: NK102VM_CIP_384964

 

Russell Road, Wimbledon

14 September — 14 September 

Delays possible - Traffic control (give & take) 

Works location: outside 13 

Works description: d 28 day c way breaking out, break out and reinstate area 4.5 x .400 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00100019151 

 

Thornton Road, Wimbledon

15 September — 17 September 

Delays possible - Traffic control (give & take) 

Works location: opposite 35. 

Works description: RS 28day b-out restore potholes in cw 1sqm. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00165454735 

 

Wilberforce Way, Wimbledon

15 September — 17 September 

Delays possible - Traffic control (give & take) 

Works location: opposite 3. 

Works description: RS 28day b-out restore potholes in cw 1.8m x1.4m & 2m x1.4m. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00112444620

Elm Grove, Wimbledon

11 September — 14 September 

Delays possible - Traffic control (give & take) 

Works location: S/O Wimbledon Hotel, On Elm Grove 

Works description: Rectify defect in the C/W 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU302000031109729-001

St John's Road, Wimbledon

10 September — 14 September 

Delays possible - Traffic control (give & take) 

Works location: side of 1 Denmark Ave. 

Works description: RS 28day 6mm Viafix to neatly fill shallow pothole in cw. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00134714709

 

Worple Road, Wimbledon

10 September — 14 September 

Delays possible - Traffic control (give & take) 

Works location: entrance from Wimbledon Hill Road. 

Works description: RS 28day 6mm Viafix to neatly fill potholes around TW sewer cover & by kerb at 

Responsibility for works: Merton 

Current status: Advanced planning 

Works reference: HC00106219053

 

Aylward Road, London

07 September — 19 October 

Delays possible - Traffic control (multi-way signals) 

Works location: FROM THE JUNCTION WITH HADLEIGH CLOSE TO OUTSIDE NUMBER 56 AYLWARD ROAD, FW 

Works description: GAS MAIN REPLACEMENT. TO LAY 99M OF 125MM PE LP MAIN, RELAY 3 SERVICES, MAKE 2 CONNECTIONS AND ABANDON EXISTING 6" CI MAIN. COMPLETE REINSTATEMENT. 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W116739400-00327 

 

Church Lane, Merton Park

08 September — 14 September 

Delays possible - Some carriageway incursion 

Works location: O/S 2 SW19 

Works description: Connections Projects: Installation of a new electricity supply for a customer: Disconnection / reconnection of existing supply for a customer. Walkway in the carriageway, spoil, vehicles 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: EC40008358075 

 

Durham Road, West Wimbledon

09 September — 15 September 

Delays possible - Some carriageway incursion 

Works location: 36 Durham road SW20 

Works description: Connections Projects: Installation of a new electricity supply for a customer: Disconnection / reconnection of existing supply for a customer. Walkway in the carriageway, spoil, vehicles. 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: EC40041654672 

 
Hadleigh Close, Merton Park

05 September — 19 October 

Delays possible - Traffic control (give & take) 

Works location: SIDE OF NUMBER 22 AYLWARD ROAD 

Works description: SECURED SITE COMPOUND 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W117354630-03064 

Russell Road, Wimbledon

18 August — 12 December 

Severe delays likely - Road closure 

Works location: o/s 13 to o/s 58A 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00245249629

  

The Broadway

17 August — 18 December 

Delays possible - Some carriageway incursion 

Works location: junction Russell Road 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00208199772 

 

Copse Hill, West Wimbledon

03 August — 25 September 

Delays possible - Traffic control (give & take) 

Works location: Footway reconstruction works one side at a time 

Works description: Footway reconstruction works one side at a time 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC0025567494 

Russell Road, Wimbledon

20 July — 30 October 

Severe delays likely - Road closure 

Works location: o/s 13 to o/s 58A 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: LONDON BOROUGH OF MERTON 

Current status: Planned work about to start 

Works reference: HC00245249629

 

The Broadway, London, Merton

20 July — 30 October 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: traffic scheme footway upgrade paving  kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011463552   

Wimbledon Bridge, Wimbledon, London, Merton

15 June — 18 November 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-565935-1

 

Worple Road, Wimbledon, London, Merton

15 June — 22 December 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HG011-568756-1

September 13, 2020