Where to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
31 August — 12 October
Severe delays likely - Road closure
Works location: C/W / F/W- Opposite Quadrangle Lodge to Next to Bus Stop O/S the Police Station 15-23
Works description: Lay 141mtrs of 125mmPE. Abandon 141mtrs of 6"CI. Complete all services. Complete all connections. Complete all reinstatement.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W116890673-05247
Botsford Road, Wimbledon Chase
07 September — 18 September
Severe delays likely - Road closure
Works location: Near junction with Kingston Road and Whately Ave
Works description: COVID-19_Temporary Safety Measures. Supply and install temporary road closure
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00143367439
14 September — 18 September
Delays possible - Some carriageway incursion
Works location: In the public footway O/S 36.
Works description: Connections Small Service: Installation of a new electricity supply for a customer: Install new three-phase service for customer. Works in public footway.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40097568263
14 September — 18 September
Delays possible - Some carriageway incursion
Works location: 9
Works description: Connections Small Service: Installation of a new electricity supply for a customer: Excavation in footway to install new service.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40076264843
14 September — 16 September
Delays possible - Some carriageway incursion
Works location: OUTSIDE 22
Works description: Rectify self defect in the Carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU302000031457377-003
15 September — 17 September
Delays possible - Traffic control (give & take)
Works location: opp 2
Works description: d 28 day c way breaking out old trench, break out and reinstate area 9.3 x .60
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00115114680
Rectory Orchard, Wimbledon Park
14 September — 16 September
Delays possible - Some carriageway incursion
Works location: Outside 9
Works description: Excavate in the footway to repair damaged chamber - NLO16210
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK102VM_CIP_384964
14 September — 14 September
Delays possible - Traffic control (give & take)
Works location: outside 13
Works description: d 28 day c way breaking out, break out and reinstate area 4.5 x .400
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00100019151
15 September — 17 September
Delays possible - Traffic control (give & take)
Works location: opposite 35.
Works description: RS 28day b-out restore potholes in cw 1sqm.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00165454735
15 September — 17 September
Delays possible - Traffic control (give & take)
Works location: opposite 3.
Works description: RS 28day b-out restore potholes in cw 1.8m x1.4m & 2m x1.4m.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00112444620
11 September — 14 September
Delays possible - Traffic control (give & take)
Works location: S/O Wimbledon Hotel, On Elm Grove
Works description: Rectify defect in the C/W
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU302000031109729-001
10 September — 14 September
Delays possible - Traffic control (give & take)
Works location: side of 1 Denmark Ave.
Works description: RS 28day 6mm Viafix to neatly fill shallow pothole in cw.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00134714709
10 September — 14 September
Delays possible - Traffic control (give & take)
Works location: entrance from Wimbledon Hill Road.
Works description: RS 28day 6mm Viafix to neatly fill potholes around TW sewer cover & by kerb at
Responsibility for works: Merton
Current status: Advanced planning
Works reference: HC00106219053
07 September — 19 October
Delays possible - Traffic control (multi-way signals)
Works location: FROM THE JUNCTION WITH HADLEIGH CLOSE TO OUTSIDE NUMBER 56 AYLWARD ROAD, FW
Works description: GAS MAIN REPLACEMENT. TO LAY 99M OF 125MM PE LP MAIN, RELAY 3 SERVICES, MAKE 2 CONNECTIONS AND ABANDON EXISTING 6" CI MAIN. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W116739400-00327
08 September — 14 September
Delays possible - Some carriageway incursion
Works location: O/S 2 SW19
Works description: Connections Projects: Installation of a new electricity supply for a customer: Disconnection / reconnection of existing supply for a customer. Walkway in the carriageway, spoil, vehicles
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40008358075
09 September — 15 September
Delays possible - Some carriageway incursion
Works location: 36 Durham road SW20
Works description: Connections Projects: Installation of a new electricity supply for a customer: Disconnection / reconnection of existing supply for a customer. Walkway in the carriageway, spoil, vehicles.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40041654672
05 September — 19 October
Delays possible - Traffic control (give & take)
Works location: SIDE OF NUMBER 22 AYLWARD ROAD
Works description: SECURED SITE COMPOUND
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117354630-03064
18 August — 12 December
Severe delays likely - Road closure
Works location: o/s 13 to o/s 58A
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00245249629
17 August — 18 December
Delays possible - Some carriageway incursion
Works location: junction Russell Road
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00208199772
03 August — 25 September
Delays possible - Traffic control (give & take)
Works location: Footway reconstruction works one side at a time
Works description: Footway reconstruction works one side at a time
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC0025567494
20 July — 30 October
Severe delays likely - Road closure
Works location: o/s 13 to o/s 58A
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: LONDON BOROUGH OF MERTON
Current status: Planned work about to start
Works reference: HC00245249629
20 July — 30 October
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011463552
Wimbledon Bridge, Wimbledon, London, Merton
15 June — 18 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-565935-1
Worple Road, Wimbledon, London, Merton
15 June — 22 December
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HG011-568756-1
September 13, 2020