Planned Roadworks In And Around Wimbledon


Where to watch out for road delays in and around SW19

South Wimbledon roadworks

Current roadworks in the Wimbledon area include:

The Broadway
26 October — 30 October
Delays likely - Lane closure
Works location: o/s 7-9, SW19
Works description : Connections Projects: Installation of a new electricity supply for a customer: Disconnection / reconnection of existing supply for a customer. Peds will be redirected to the nearest, safest crossing point.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference:  EC40081561045

Wimbledon Hill Road, Wimbledon
26 October — 26 October
Delays likely - Lane closure
Works location: 25-27
Works description : Sewer cover replacement in carriageway
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference:  MU026002252MZYR--001001

Russell Road, Wimbledon

18 August — 12 December 

Severe delays likely - Road closure 

Works location: o/s 13 to o/s 58A 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00245249629

  

The Broadway

17 August — 18 December 

Delays possible - Some carriageway incursion 

Works location: junction Russell Road 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00208199772 

Russell Road, Wimbledon

20 July — 30 October 

Severe delays likely - Road closure 

Works location: o/s 13 to o/s 58A 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: LONDON BOROUGH OF MERTON 

Current status: Planned work about to start 

Works reference: HC00245249629

 

The Broadway

20 July — 30 October 

Delays possible - Some carriageway incursion 

Works description: traffic scheme footway upgrade paving  kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011463552   

Wimbledon Bridge, Wimbledon

15 June — 18 November 

Delays possible - Some carriageway incursion 

Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-565935-1

 

Worple Road, Wimbledon

15 June — 22 December 

Delays possible - Some carriageway incursion 

Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HG011-568756-1